| Clients | Work | Technology/engineering | Hour Worked | Emphasized |
|---|---|---|---|---|
| Abolio y Rubio (La Paulina) | Plant of soft and semihard cheeses, extension auxiliary services, storage and pasteurized of milk and production of cheeses, mounting of equipment, machanical mounting, sanitary aseptic installation. | Technology Goavec Chalon Megard engineering of details ASSI S.A |
82.000 |
Weld of high specification (Rx100%) |
| Aceitera general Deheza | Construction and mounting, plants dried of flour of soybean.Mechanic engineering, piping and extension without solvent Geza 5. Plant peeled of flour of soybean. |
Engineering of detail ASSI S.A. | 19.000 |
Mounting of heavy components. |
| Asoc. de Cooperativas Argentinas CL | System execution of fire, piping and automation factory of vegetable oils. |
Engineering of detail ASSI S.A. | 16.000 |
|
| Arla Foods Ingredients AFISA Planta Porteña | Mechanic mounting and extension .Plant WPC. Complementary installations of building extension. | Engineering of detail ASSI S.A. | 13.500 |
|
| Atanor S.A. | Distillation and purification of sulphuric acid, mechanical mounting. | Atanor S.A engineering | 49.000 |
Weld of high specification (Rx100%) |
| Buffon S.R.L. | Engineering, construction and electromechanical mounting and automation. Plant production of liquid fertilizers. |
Basic engineering and detail ASSI S.A “key in hand.” | 37.000 |
|
| Cabaña y Est. Sta. Rosa (Las Parejas) Grupo Bongrain | Plant of soft cheeses, mounting of equipments, mechanic, sanitary installation, electrical mounting and instruments for plant Cip, mounting of equipments, air conditioning. | Basic engineering and detail ASSI S.A “key in hand.” | 20.000 |
|
| Cerveceria y Malteria Quilmes (Planta Pompeya) | New plant of water flavored Gatorade Kids. Construction and mounting of equipments. Plant of juice of lemon. |
Electromechanical mounting
|
1.200
|
|
| Mechanic mounting -System installation of net against fire. South plant. | Electromechanical mounting | 8.000 |
||
| Mounting of piping.Room of finished syrup | Electromechanical mounting | 7.500 |
||
| Cerveceria y Malteria Quilmes (Planta Trelew) | New plant of water flavored Gatorade Kids. Construction and mounting of equipments. Plant of juice of lemon. | Electromechanical mounting | 1.000 |
|
| Cerveceria y Malteria Quilmes (Planta Tres Arroyos) | Montaje de piping, Racks y soportes | Electromechanical mounting | 20.000 |
|
| Cerveceria y Malteria Quilmes (Tucumán) | Plant of finished beer, mounting of piping: plant of water, room of bottle factory, rack, Cip and packed. |
Electromechanical mounting
|
23.500
|
Weld of high specification (Rx100%) |
| Construction and mounting of new room of syrup. | Electromechanical mounting | 3.000 |
||
| Cerveceria Budweiser | Room of cooking, mechanic, electrical and instrumental mounting. Room of cooking | Teconología Steinecker Ingeniería ASSI | 71.200 |
Mounting of heavy components. |
| Compañía Industrial Cervecera (Santa Fe) | Room of yeast, filtration, fermetation Cip and rest. Mechanic, electrical and instrumental mounting. Rooms of filtration, Cip, fermetation and rest. |
Engineering GEA-Tuchenhagen. Electromechanical mounting ASSI |
82.700 |
Weld of high specification (Rx100%) |
| Room of finished beer, mechanic, electrical and instrumental mounting, room of rest and finished beer. | Engineering Sudmo . Electromechanical mounting ASSI |
25.300 |
||
| Montage of equipments for installation of warehouse and room of prepared. | Electromechanical mounting | 4.500 |
||
| Electrical engineering and automation .Plant of beer of Heineken. | Basic engineering and detail ASSI S.A | 9.000 |
Weld of high specification (Rx100%) |
|
| Line extension 1 and 2 of packed | Electromechanical mounting | 32.000 |
||
| Construction and montage of extension and improvements of beer plant. | Electromechanical mounting | Mounting of heavy components. | ||
| Provision of tanks of 60.000 and 25.000 lts for yeast. | Construction in our workshops | 7.000 |
||
| Electrical engineering.Extension of plant. | Basic engineering and detail ASSI S.A | 300 |
||
| Compañía Industrial Cervecera (Salta) | Construction and mounting of new beer plant. | Basic engineering and detail ASSI S.A. electromechanical mounting |
53.000 |
mounting of heavy components. |
| Engineering and construction of net against fire. Plant Salta. | Basic engineering and detail ASSI S.A. electromechanical mounting |
4.800 |
||
| Cementera Corcemar | Alternative fuel plant, construction of three tanks of 100m3 for storage of fuel, mechanical mounting, electrical and instrumental , installation anti-explosive. | Engineering ASSI S.A “key in hand.” | 23.400 |
mounting of heavy components. |
| Danone S.A. (ex La Serenisima) | Plant chesse, desserts and Cip, mounting equipments, installation aseptic sanitary,electrical and instrumental. | APV France | 112.000 |
|
| Plant of storage and distribution of powder, mounting equipment, installation of piping , electrical and instrumental. | Guerin Systems | 12.000 |
Weld of high specification (Rx100%) |
|
| Plant of yogurt, mounting of equipment, sanitary aseptic installation, electrical and instrumental. | APV France | 25.000 |
||
| Technological improvements and expansion pneumatic movement of powders and desserts, Longchamps. | Basic engineering and detail ASSI S.A. electromechanical mounting |
3.500 |
||
| Provision of tanks of Cip 30000 lts. | Construction in our workshops | 5.000 |
||
| Eco de los Andes S.A. (Tunuyan) | Mounting of piping, service, osmosis and filtres. | Electromechanical mounting | 15.000 |
|
| Frio Industrias Argentinas S.A. | Construction of equipments condensers, dryers, coolers. | Construction in our workshops | 6.000 |
mounting of heavy components. |
| Engineering of details.Plant chlorine soda. | Basic engineering and detail ASSI S.A | 300 |
||
| Mounting of metallic structure, equipment and piping. Incineration plant. Plant Villa Mercedes-San Luis. | Construction in our workshops | 250 |
mounting of heavy components. | |
| Juan Minetti S.A. | Electromechanical mounting of system against fire.Plant Córdoba. | Electromechanical mounting | 300 |
|
| Engineering net against fire CCM and quarries.Plants old position | Basic engineering and detail ASSI S.A | 250 |
||
Construction of reservoirs of air compressed |
Construction in our workshops | 1.900 |
||
| Molfino Hnos | Construction and mounting of equipments for dried WPC. Room of pasteurized and treatment of whey project casein | Construction in our workshops | 31.000 |
mounting of heavy components. |
Construction of cyclones. |
Construction in our workshops | |||
Adequacy and mounting of tanks Cow Water and silos of raw milk. |
Construction in our workshops | |||
Construction and mounting. Structure of sales. |
Basic engineering and detail ASSI S.A | |||
Construction and montage, hydraulic system of elevation of baskets |
Basic engineering and detail ASSI S.A | |||
Construction and mounting of Ducts. |
Construction in our workshops | |||
| Norit Südmo Latinoamerica S.A. | Construction of tanks Cip | Construction in our workshops | 3.700 |
|
| Petroquimica Río Tercero S.A. | Mounting of plant recovered of TDI, system List, mounting of equipments, metallic structures, pipings and insulation |
Technology List (Suiza). Engineering of detail ASSI S.A. |
25.000 |
Weld of high specification (Rx100%) |
Mounting of plant chlorine soda, civil work, prefabricated and mounting of metallic structures, mounting of equipments, installation of piping |
Technology De Nora Engineering of detail ASSI S.A |
35.000 |
mounting of heavy components. | |
Building of electrolysis, civil work extension. |
Electromechanical mounting | 7.000 |
||
Beach of acid nitric stock, construction and mounting |
Electromechanical mounting | 11.000 |
||
Construction of tanks of aluminium for nitric acid of 200 m 3. |
Construction in our workshops | 16.000 |
Weld of high specification (Rx100%) |
|
Construction of tank of fuel oil 1.000.000 of Lts.. |
Construction in our workshops | 7.000 |
mounting of heavy components. | |
Maintenance of external workshop, repair of banks of phosgene. |
Electromechanical mounting | 265.000 |
||
| Construction of tanks of aluminium of 100 and 200 m3. | Construction in our workshops | 6.000 |
Weld of high specification (Rx100%) |
|
Construction of tanks of aluminium of 100 and 200 m3. |
Construction in our workshops | 4.000 |
||
| Mechanical mounting and electro instruments. Plant Den Sac. | Electromechanical mounting | 31.300 |
Weld of high specification (Rx100%) |
|
Mechanical, electrical and civil work mounting . Plant inverse Osmosis |
Electromechanical mounting | 4.500 |
||
| Peñaflor S.A. | Construction of 30 tanks of 15000 lts. | Construction in our workshops | 33.200 |
|
| Pritty S.A. (Córdoba) | mounting of plant of drinks carbonated, mounting of equipments, installation, distribution of auxiliary services, room of blown, packed and waters plant. | Engineering of detail of services ASSI S.A. |
27.000 |
|
| Refinerias del Maiz (Pilar) | Plant of milk of soybean and juices, mounting of equipments, sanitary installation, and auxiliary services. | Alfa Laval Tetra Pack |
17.900 |
|
| Sancor Sunchales | Extension general services, distribution, general services, steam, Nh3, frozen water and others, mounting of equipments, mechanic, electrical and instruments. |
Project Sancor CUL | 73.000 |
|
Plant of milk UAT - CIP, mounting of equipments, mechanic, sanitary aseptic installation ,electrical and instruments mounting .Plant Cip. |
Engineering GEA-Tuchenhager | 31.700 |
Weld of high specification (Rx100%) |
|
| Plant of milk UAT, mounting of equipments, machine of packed, mechanical , electrical and instruments mounting. | Alfa Laval Tetra Pack |
17.000 |
Weld of high specification (Rx100%) |
|
| Sancor Chivilcoy | Plant of microfiltered milk and UAT, extension, distribution, general services, steam, Nh3, frozen water and others. Mechanical , electrical mounting and instruments . Sanitary aseptic installation. | Engineering Sancor CUL Technology Alfa Laval Tetra Pack |
125.000 |
Weld of high specification (Rx100%) |
| Sancor Centeno | 27-Construction of tanks isolated of 60.000 lts |
Construction in our workshops | 4.500 |
|
| Sancor San Guillermo | Construction of tanks of 1500 lts.. | Construction in our workshops | 9.400 |
|
| S.A. La Sibila | Plant of treatment of milk mounting, electrical installation and instrumentation-Nogoyá. | Electromechanical mounting | 2.700 |
|
| Tanks and stainless steel, construction and mounting | Construction in our workshops | 4.500 |
||
mounting of circuit of momentun (drive) and new pasteurized |
Electromechanical mounting | 32.000 |
||
| Other minor works. | Frigorifico Saladillo-Citrusvil S.A- Petroquimica Río Tercero-Atanor S.A,etc | Variety | 100.000 |
|
Whole of occupied hours period 2004-2007 |
1.828.750 |
|||